ongoing-project

Carrying out Survey, Preparation of detailed construction plan, Design & Estimates for Pipe distribution network system for Upper Pravara (Nilwande-2) Project Km 2 to 85, Low Level Dy, Kopergaon Branch Canal and Tail Canal of Upper Pravara Left Bank Canal (UPLBC) and Upper Pravara Right Bank Canal (UPRBC) Km 1 to 18. ( Project Cost – 3000 Cr. )

Preparation of DPR of Saklai,  lift irrigation scheme in Ahmednagar district ( Project Cost – 1100 Cr. )

45000 +  Hector 

Preparation Of Detailed Project report of rural roads in Maharashtra for Maharashtra  Rural Road  Developement Agency (PMGSY)

Lenght : 500 + km

Project Management Consultancy  of rural & urban  water supply schemes in various districts in Maharshtra under Jal Jeevan Mission

50+ Schemes